Home | About Us | Contact Us | Request Information | FAQs | Links | Site Map

The most affordable Beam Coping solution in the world....
CNC Steel Beam Coping
Beam coping explained
Typical copes
CNC coping vs. manual coping

VIDEOS - Steel Beam Coping

Beam Coping Specifications

Technical Specifications

Single torch vs. triple torch
Consumable costs
Oxy-fuel, plasma, & lasers
Material Handling
Material Handling - Conveyors and Cross Transfers for beam coping and sawing
Purchasing
Ocean Dealer Network
Beam coping cost justification
Leasing Programs
Programming
Programming the CNC machine
Training and Support
Installation and Training
Technical support
Warranty
Safety
Safety standards
Complimentary Machines
Ocean Avenger Beam Drill Line
Ocean Terminator Band Saws

Ocean Clipper CNC Angle Line

Ocean Machinery
 

 

training to use coping machine

Important Note regarding Operator Training

CNC beam coping machines, more than any other CNC machine in structural steel shops, depend on well-trained operators. Operators must not only be able to program and operate the machine, but they MUST have a solid understanding of oxy-fuel flame cutting.

 

Become a Certified CNC Beam Coping Machine Operator

 

Operators of the Ocean Liberator CNC beam coping machine need to have received professional training. This is critical for fast, efficient production.

For this reason, Ocean and Peddinghaus insist that prior to installation of your Ocean Liberator, your operator/s must attend intensive beam coping training at the Peddinghaus training facility in Bradley Illinois.

 

 

 

 

 

What training is provided for this CNC beam coping machine?

Once your employees are certified as competent beam coping machine operators, the Peddinghaus Service Tech will travel to your facility to install your machine. Once the machine is installed the service tech will then provide refresher training and help your operators get up to speed as fast as possible.

It is your responsibility to ensure that ALL operators of the Ocean Liberator have been trained in our Operator Certification Program.

NOTE 1. This is a requirement of the machine warranty as our experience tells us that for the most part, machine problems are really most often operator problems, and all our companies benefit from ensuring that operators are properly trained.

NOTE 2.  At any time we can provide in-house refresher training for existing and operators of the Ocean Liberator CNC beam coping machine.

 

 

How long does it take to install the machine?

The Ocean Liberator CNC Beam Coping Machine can be installed and operational in your facility less than 5 days after receiving the machine.

The machine uses convenient 220V single phase power supply so no major electrical preparation is required.

Oxy-Fuel cylinders need to be stored nearby to feed the gases to the machine.

 

Call Ocean Machinery today at 954 956 3131 to get the NEW Ocean Liberator video and literature, or fill out our online Information Request Form.

Ocean Machinery Steel Fabricating Machinery | Ocean Avenger Beam Drill Line  | Ocean Terminator Structural Steel Band Saws | Ocean Clipper Angle Line

Web Design and Search Engine Optimization by Adept Productions